Cruciform Hub_0137

UK Hydrographic Office

 

UK Hydrographic Office Complete 

BCL are pleased to announce our part in the completion of the UK Hydrographic Office in Taunton, which was officially opened in April 2019 by the Princess Royal. The renovation of the headquarters was led by AHR Architects, BAM Construction and Mace group, with BCL’s panels as its defining feature.

 

BCL supplied and installed the internal cladding for the space, using Siberian Larch slats measured at 19 x 44 mm fixed to Oak battens in the centre of each board for support. The timber spans over 2000 m2 of the building. Each slat had been treated with class 0 fire protection and has grey acoustic fabric between timber battens.

smaller.jpg

Adam Spall, the regional director at AHR Architects had this to say of BCL’s work:

“The larch clad baffles in the UK Hydrographic Office atrium are the central design feature of the building. They perform a critical role in terms of diffusing daylight and reducing reverberation but presented a huge technical challenge to achieve the sinuous curves while being installed at high level.

AHR brought in the BCL timber team at a very early stage of the project to see if their panelised system could achieve the curved design while maintaining the appearance of a 40m long continuous timber beam. The bespoke panels have achieved this perfectly and the larch clad baffles are the centrepiece of this fantastic building.”

We are thrilled to have been instrumental in the production of this fantastic new workspace.

For our full case study and more projects like this, check out our gallery page here.

  

Copyright © BCL Timber Projects Ltd.
BCL Timber Projects Ltd. Registered in England No. 1178084
VAT No. 200 4246 29
The Old Byre, Oakley Farm, Pound Lane, Hurst, Berkshire, RG10 0RS
Tel - 01189 344 155

pefc logo greenBCL foresty logoISO logo web

Website design and build Jigsaw Web Design Ltd