BCL Timber Projects Ltd
 

Timber Project: Redland School - Bristol


SIZE:
6,000m2
VALUE
£1.5 million
COMPLETION DATE
December2007
DURATION
18 Months
LOCATION
Bristol

timber claddingdiagram

download pdf

 

Features

  • timer projects picSteel framing system, insulation and membranes
  • Heat-treated, pre-painted Cape Cod cladding
  • Prefabricated cladding panels
  • Vertical feature battens
  • Concealed fixing details
  • 15-year warranty on paint finish

BCL’s brief was to install a complete weatherproofing solution which included steel framing, insulation, membranes and cladding. By prefabricating the cladding panels off-site the installation time and impact on other contractors was significantly reduced. Greater accuracy can also be achieved off-site and this is reflected in the high quality of the finished product.

BCL design expertise produced a solution that was not only highly durable but also cost-effective.
Cape Cod cladding is factory heat-treated and pre-painted so no further treatment is required after assembly of the panels and this was also reflected in the cost.

The use of concealed fixings meant that the treated timber – and the 15-year warranty on the paint finish – was not compromised in any way and offered aesthetic advantages. Vertical feature battens on the cladding also added to the overall appeal of
the finish.

BCL Timber Projects Ltd , The Old Byre, Oakley Farm, Pound Lane, Hurst, Berkshire, RG10 0RS
Tel 0118 934 4155